22 – 24 Boronia Street, NSW
Background In December 2021, a severe storm hit Dee Why, causing extensive structural damage to the two-storey residential block at 21-24 Boronia Street. This included damage to the roof, balustrades, and other external elements of the building. The residents faced immediate safety concerns, prompting the installation of scaffolding and subsequent disruption to balcony and garage […]
2 Greenwich Road
Rusting reinforced steel replacement Concrete spalling repairs Rolling scaffold provision
6 Billong Avenue
Balcony Remediation (Class 2): Ensuring safety and structural integrity Waterproofing: Protecting against moisture and water damage. New Balustrades: Enhancing aesthetics and safety standards. Painting: Revitalizing the building’s appearance. New Guttering: Improving drainage and longevity. Concrete Spalling Repairs: Addressing structural concerns. Brickwork Repairs: Restoring the building’s original charm. New Driveway Slab: Enhancing accessibility and functionality.
431 Warringah Road
External torch on rooftop membrane application (3,500 m2) EWP provision Brickwork remediation Roof duct removal Concrete topping repairs
10 Regent Street
Concrete spalling repairs both internally & externally Magnesite removal Internal bathroom & laundry demo, waterproof, tile & fit out Full scaffold & EWP provision Paint & render window replacements/ refurbishments Brickwork repointing Kitchen remediation works
15 Jenkins Street
Concrete spalling repairs Concrete hob installation Balustrade & gate instalment throughout entire building Full scaffold & EWP provision Front garden and common area remediation Brickwork repairs
36 Bennett Street
Balcony membrane replacement & retile Cavity flashing installation Full building protective coating system Full scaffold & swing stage provision Street front entrance upgrade Rooftop membrane application Concrete spalling repairs Paint & render
9 Shellcove Road
Removal of failed rooftop waterproof Carry out repairs & replace rotten timber cladding • Supply and install Ardex WPM 1000 sheet membrane
Telstra Exchange
This East Coast of Australia’s main telephone exchange required a remedial builder to carry out façade enhancements and remediation. BIM worked in conjunction with Ventia(previously Broadspectrum) as the head contractor The Challenges that were overcome – Maintaining full operation of Telstra operations during the works was paramount in particular to dust, noise and site security […]
Surfview Road
The owners contacted BIM after a previous builder quoted for major works and the owners required a second opinion. BIM worked in conjunction with a remedial engineer to develop a cost effective solution to remediate their structural issues – Solutions were developed for the below issues – Concrete Spalling Structural upgrades to balcony attachment points […]